Simple Site Installation

Simple Site Installation
  1. Temporary supports

    Propping on parallel beams at 1.8 to 2.5m spacing.

  2. Placing elements

    Tailor made semi precast elements lifted into position.

  3. Joint reinforcement

    Loose bottom splice bars and tie top mesh across joints.

  4. Shear reinforcement

    Across columns if needed.

  5. Edge reinforcement

    Edge bars and hairpins around slab perimeter.

  6. Perimeter shuttering

  7. Preparation

    Seal joints, clean and moisten precast concrete layer

  8. Concreting

    Pour, vibrate and level/power float

  9. Temporary works

    Remove, typically after 1-2 weeks, according to specific site advice.

  10. A seamless flat slab is obtained..

Reduced Installation Costs

Fast erection - cycle per storey down to 4 days.
Light and cheap lifting equipment
Easy incorporation of pipes, ducts etc in the slab.
Subsequent work is simplified due to the flat soffit with no obstructiong beam.

Additional Thoughts

Less waste material on site.
Less disturbance of surroundings (Less transport, less lifting)